








{"id":15724,"date":"2026-05-02T16:04:20","date_gmt":"2026-05-02T14:04:20","guid":{"rendered":"https:\/\/almacon.nl\/sprinkler-floor-as-a-smart-solution-for-fire-safety-in-a-tall-distribution-center\/"},"modified":"2026-05-03T15:43:22","modified_gmt":"2026-05-03T13:43:22","slug":"load-bearing-sprinkler-structure-as-a-smart-solution-for-fire-safety-in-a-tall-distribution-center","status":"publish","type":"post","link":"https:\/\/almacon.nl\/en\/load-bearing-sprinkler-structure-as-a-smart-solution-for-fire-safety-in-a-tall-distribution-center\/","title":{"rendered":"Load-bearing sprinkler structure as a smart solution for fire safety in a tall distribution center"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;4.27.0&#8243; background_enable_image=&#8221;off&#8221; min_height=&#8221;259px&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; min_height=&#8221;476px&#8221; custom_padding=&#8221;0px||11px|||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;4.27.6&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; min_height=&#8221;1822.8px&#8221; custom_margin=&#8221;-75px||-73px|||&#8221; custom_padding=&#8221;78px||35px|||&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<p>In a modern distribution center, everything revolves around efficiency, flexibility, and safety. But what if the building\u2019s height itself poses a fire safety issue? This was precisely the challenge facing one of Almacon\u2019s clients. The distance between the roof and the stored goods was too great to comply with applicable sprinkler standards. This called for a smart, innovative, custom solution that complied with all laws and regulations.<\/p>\n<h2><strong>The project<\/strong><\/h2>\n<p>The request came from a specialist in warehouse racking and automated storage systems. The end customer had built a distribution center that is flexibly leased to various users, each with their own type of storage.<\/p>\n<p>With a building height of approximately twelve meters, a problem arose: a sprinkler system on the roof was too far from the goods. As a result, the building did not meet fire safety requirements. At the same time, sufficient floor space had to remain available for the storage of loose pallets and logistics operations.<\/p>\n<div class='et-box et-shadow'>\n\t\t\t\t\t<div class='et-box-content'><h4><em><strong style=\"color: #e42313;\">The question was clear: how do you bring the sprinklers closer to the storage area without sacrificing flexibility and storage space?<\/strong><\/em><\/h4><\/div><\/div>\n<h2><strong>Solution: a smart load-bearing sprinkler structure<\/strong><\/h2>\n<p>The solution lay in a specially designed, lowered structure: a load-bearing sprinkler structure. This is a lightweight, non-walkable custom-built support structure to which the sprinkler system is attached.<\/p>\n<p>By placing this structure between the roof and the storage area, the sprinklers are positioned at the correct height. This ensures compliance with applicable fire safety requirements, while the entire space beneath the structure remains available for storage and logistics operations.<\/p>\n<p>The structure consists of:<\/p>\n<ul>\n<li>columns and a beam structure<\/li>\n<li>a corrugated steel sheet on top<\/li>\n<li>sprinkler pipes, attached to the underside of the floor<\/li>\n<\/ul>\n<p>The design was based on a number of key principles:<\/p>\n<ul>\n<li>a lightweight construction<\/li>\n<li>large spans for maximum use of space<\/li>\n<li>an unscored version<\/li>\n<li>preserving as much floor space as possible<\/li>\n<\/ul>\n<p>Thanks to the large spans and the unsupported design, the space beneath the structure remains fully available for storage and logistics operations. This solution thus makes it possible to utilize the full height of the distribution center for storage without compromising fire safety.<\/p>\n\n\t\t<style>\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 50%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-1' class='gallery galleryid-15724 gallery-columns-2 gallery-size-full'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1200\" src=\"https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.58.jpeg\" class=\"attachment-full size-full\" alt=\"1 Almacon Storage Systems Sprinklerverdiepingsvloer\" srcset=\"https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.58.jpeg 1600w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.58-1280x960.jpeg 1280w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.58-980x735.jpeg 980w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.58-480x360.jpeg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1600px, 100vw\" \/>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1200\" src=\"https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-2.jpeg\" class=\"attachment-full size-full\" alt=\"11 Almacon Storage Systems Sprinklerverdiepingsvloer\" srcset=\"https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-2.jpeg 1600w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-2-1280x960.jpeg 1280w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-2-980x735.jpeg 980w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-2-480x360.jpeg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1600px, 100vw\" \/>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/>\n\t\t<\/div>\n\n<h2><strong>Laws and regulations as a starting point<\/strong><\/h2>\n<p>Legislation and regulations play a key role in successfully implementing this solution. Fire safety requirements depend on regional regulations, the building\u2019s use, and its total volume. A crucial factor here is the maximum distance between the sprinkler and the goods.<\/p>\n<p>It is precisely on this point that the load-bearing sprinkler structure offers a solution: because the sprinklers are installed lower in the building, standards are still met, while high-rise storage remains possible. At the same time, the presence of a sprinkler system often allows for lower fire resistance requirements to be imposed on the main load-bearing structure. This provides additional design flexibility.<\/p>\n<h2><strong>Projectdetails<\/strong><\/h2>\n<p>The project included multiple units within a single distribution center:<\/p>\n<ul>\n<li>9 separate units<\/li>\n<li>total area of 45,000 m\u00b2<\/li>\n<li>a dedicated sprinkler floor structure per unit<\/li>\n<\/ul>\n<p>The spans ranged from:<\/p>\n<ul>\n<li>8 x 8 meter<\/li>\n<li>8 x 12 meter<\/li>\n<\/ul>\n<p>The design took the following into account:<\/p>\n<ul>\n<li>sufficient clearance beneath the structure<\/li>\n<li>the location of expansion joints (joints in a concrete floor that accommodate expansion and contraction)<\/li>\n<li>an unedited version<\/li>\n<\/ul>\n<p>The following factors were taken into account when calculating the sprinkler floor:<\/p>\n<ul>\n<li>the weight of sprinkler pipes<\/li>\n<li>cable trays and lighting<\/li>\n<\/ul>\n<p>Extra clearance has been intentionally provided to ensure that future installations can be accommodated without any issues.<\/p>\n\n\t\t<style>\n\t\t\t#gallery-2 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-2 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 50%;\n\t\t\t}\n\t\t\t#gallery-2 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-2 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-2' class='gallery galleryid-15724 gallery-columns-2 gallery-size-full'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1200\" src=\"https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-9.jpeg\" class=\"attachment-full size-full\" alt=\"7 Almacon Storage Systems Sprinklerverdiepingsvloer\" srcset=\"https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-9.jpeg 1600w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-9-1280x960.jpeg 1280w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-9-980x735.jpeg 980w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-9-480x360.jpeg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1600px, 100vw\" \/>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"1200\" src=\"https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-14.jpeg\" class=\"attachment-full size-full\" alt=\"4 Almacon Storage Systems Sprinklerverdiepingsvloer\" srcset=\"https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-14.jpeg 1600w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-14-1280x960.jpeg 1280w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-14-980x735.jpeg 980w, https:\/\/almacon.nl\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-13-at-13.41.57-14-480x360.jpeg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) and (max-width: 1280px) 1280px, (min-width: 1281px) 1600px, 100vw\" \/>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/>\n\t\t<\/div>\n\n<h2><strong>The Power of Almacon<\/strong><\/h2>\n<p>This project required more than just a structural solution. It demanded an understanding of laws and regulations, flexibility in design, and speed of execution. By developing a custom solution within the framework of laws and regulations, we created the flexibility needed to make optimal use of the building. It is precisely in these types of challenges that Almacon makes a difference\u2014by combining technical expertise, practical insight, and safety into a single design.<\/p>\n<h2><strong>What are your options?<\/strong><\/h2>\n<p>Do you operate a high-bay distribution center and are you facing fire safety requirements? If so, a sprinkler structure may be the solution you\u2019re looking for. Please <a href=\"https:\/\/almacon.nl\/en\/contact\/\"><strong>contact<\/strong> <\/a>one of our engineers so we can discuss your specific situation.<\/p>\n<p>\ud83d\udcde<span> Call<\/span><span>\u00a0<\/span><a href=\"tel:+31793610663\">079-3610663<\/a><br \/>\ud83d\udce7<span> <\/span><strong>Mail<\/strong><span> <\/span><a href=\"mailto:info@almacon.nl\">info@almacon.nl<\/a><\/p>\n<p>&nbsp;<\/p>\n<h4 style=\"text-align: center;\"><strong><em>\u201cAlmacon literally and figuratively lifts customers up to a higher level\u201d<\/em><\/strong><\/h4>\n<p><strong> <\/strong><\/p>\n<h3><strong><em><\/em>Read also<\/strong><\/h3>\n<p class=\"entry-title\"><a href=\"https:\/\/almacon.nl\/en\/back-to-basics-modular-floor-system-from-almacon\/\">The Baseline: Almacon\u2019s modular floor system\u2014get a quote in just a few clicks<\/a><br \/><a href=\"https:\/\/almacon.nl\/en\/mezzanine-with-long-spans-for-space-and-efficiency\/\">Mezzanine with a large span for more space and efficiency<\/a><\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>An Almacon customer faced a challenge. The height of the distribution center posed a fire safety issue. The distance between the roof and the stored goods was too big to comply with applicable sprinkler standards. Read more about our smart and innovative solution.<\/p>\n","protected":false},"author":2,"featured_media":15719,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","wds_primary_category":44,"footnotes":""},"categories":[45,48],"tags":[],"dipi_cpt_category":[],"class_list":["post-15724","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-algemeen-en","category-projects"],"_links":{"self":[{"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/posts\/15724","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/comments?post=15724"}],"version-history":[{"count":22,"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/posts\/15724\/revisions"}],"predecessor-version":[{"id":15808,"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/posts\/15724\/revisions\/15808"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/media\/15719"}],"wp:attachment":[{"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/media?parent=15724"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/categories?post=15724"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/tags?post=15724"},{"taxonomy":"dipi_cpt_category","embeddable":true,"href":"https:\/\/almacon.nl\/en\/wp-json\/wp\/v2\/dipi_cpt_category?post=15724"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}